Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Australia: Great News for Wavebreak Island Project
News

September 20, 2012 · about 14 years ago

Australia: Great News for Wavebreak Island Project

The international company behind the proposed $4.9 billion cruise ship terminal and associated development adjacent to Wavebreak Island in the Broadwater says it can create an even better break for surfers at what is known as TOS (The Other Side) on South Stradbroke Island. Sembawang of Singapore Gl

2 minutes read
  • LinkedIn
  • X
  • Email

The international company behind the proposed $4.9 billion cruise ship terminal and associated development adjacent to Wavebreak Island in the Broadwater says it can create an even better break for surfers at what is known as TOS (The Other Side) on South Stradbroke Island.

Sembawang of Singapore Global Project Underwriters’ President and CEO Ric Grosvenor , himself a surfer, says protecting TOS is an absolute priority.

Mr Grosvenor earlier this week issued an invitation to twice world surfing champion Mick Fanning to be involved in planned dredging of the Gold Coast Seaway to ensure that the banks that create the highly popular TOS break are not impacted.

“ We have gone one better, our engineers Arup have looked at the profile of the ocean floor at the Seaway and South Stradbroke and they understand totally how the wave is formed and they say that we can improve the bank and create an even more consistent and better formed wave, ” he said.

“I’ll call it the Wavebreak Wave that TOS can bank on.”

Arup Engineers Principal and Maritime Leader Australasia, Gary Lucas, who designed the Gold Coast Seaway and the associated Wavebreak Island said through the process of ongoing dredging that will need to be done to keep navigation channels open for cruise ships sand can be directed onto the banks that create the TOS break.

“Our hydrodynamic models will predict the changes to the general contours resulting from the project, ” he said.

“ Modeling will then be used to improve the banks and the wave by using sand harvested in the construction and maintenance of the navigation channels and pumped directly onto the TOS banks.

“Members of our Wavebreak engineering team are surfers who regularly surf at TOS and we understand totally how the break is formed.

“We scientifically understand what is happening and we can replicate and improve the wave forming contours.”

Mr Grosvenor said the surfing community should become involved in the planning phase of the dredging and he gave a commitment that Sembawang would improve the TOS break not damage it.

“ If Mick (Fanning) and other high profile guys who understand the way the ocean and waves work want to get involved I’d be very excited ,” he said. “ We will work with them to make TOS one of the most talked about beachbreaks in the world.”

[mappress]

Press Release, September 21, 2012

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago