Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›USA: EPA Changes Farmingdale Cleanup Plan
News

October 11, 2012 · about 14 years ago

USA: EPA Changes Farmingdale Cleanup Plan

The U.S. Environmental Protection Agency has finalized a change to its plan to clean up ground water at the Liberty Industrial Finishing Superfund site in Farmingdale, New York. Industrial operations at the Liberty site, including aircraft parts manufacturing during the Second World War and metal pl

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Environmental Protection Agency has finalized a change to its plan to clean up ground water at the Liberty Industrial Finishing Superfund site in Farmingdale, New York.

Industrial operations at the Liberty site, including aircraft parts manufacturing during the Second World War and metal plating and fiberglass manufacturing in the post-war years polluted ground water at the site. In addition, dry cleaning operations at the Farmingdale Plaza Cleaners, located 1,000 feet to the north of the site, resulted in a second source of ground water contamination. In both instances, the ground water was contaminated with volatile organic compounds, which can cause serious damage to people’s health and the environment. In 2002, the EPA issued a plan to install two separate systems to treat the portion of ground water contaminated by the manufacturing facility and the portion contaminated by the dry cleaner site.

The system to treat contamination from the industrial operations at the site has been constructed and is currently operating to treat that contamination. In July 2012, the EPA proposed the cancellation of plans to construct the second system because the dry cleaner site is being cleaned up by the New York State Department of Environmental Conservation. Recent monitoring data shows that the contamination levels in the portion of ground water under the Liberty Industrial site that was contaminated by the dry cleaner site have dropped significantly.

The EPA held a public meeting in Farmingdale on July 26, 2012 to explain the changes to the ground water cleanup plan. The EPA took public comment for 30 days and considered public input before finalizing the plan.

[mappress]

Press Release, October 12, 2012

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago