Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Lithuania: Klaipeda Port Infrastructure Project Completed
News

October 18, 2012 · about 13 years ago

Lithuania: Klaipeda Port Infrastructure Project Completed

In the afternoon of the 8th of October 2012 the first experimental vessel „Tanais Leader“ was berthed at the anew constructed quay No. 67A, operated by Klaipėda Stevedoring Company „Bega“. Klaipėda State Seaport Authority was the contracting party of this object. Back in the history – on the 2nd of

2 minutes read
  • LinkedIn
  • X
  • Email

In the afternoon of the 8th of October 2012 the first experimental vessel „Tanais Leader“ was berthed at the anew constructed quay No. 67A, operated by Klaipėda Stevedoring Company „Bega“.

Klaipėda State Seaport Authority was the contracting party of this object.

Back in the history – on the 2nd of September 2010 the Port Authority concluded the contract agreement with Josef Möbius Bau-Aktiengesellschalf (presently Josef Möbius Bau-GmbH) on the construction works of the object „ Reconstruction of quays No. 66 and No. 67 with extension of quays No. 66a and 67 a. The II construction stage – extension of quays No. 66a and 67a with local engineering networks “. The contract price was 51 999 991,38 Lt, including all costs and taxes.

Quays No. 66a and 67a form a pier, designated for handling operations. The length of already constructed pier is 236,80 metres, the width is 30 metres and the depth at the pier reaches up to 13 metres (in future it will be up to 14,5 metres). The already constructed pier provides additional possibilities to Klaipėda Stevedoring Company „Bega“ to handle bulk, general and liquid cargoes.

„ It is necessary to emphasize that the completion of this pier is the largest investment project of Port Authority that was completed this year, but not the last one. In the nearest future the Port Authority plans to complete the construction of the quay No. 143 A, the construction price of which amounts to 16,3 million litas, and the reconstruction of quays No. 8-9 with investments to reconstruction reaching up to 24 million litas. As it is known, the function of Port Authority is to ensure the development of Port capacity and competitiveness, but I always feel a great satisfaction when the constructions of the objects of such a size and financial value are completed ,“ said Roma Museckienė, the infrastructure and development director.

[mappress]

Press Release, October 18, 2012

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago