Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›UK: Officials Introduce Plans for QEC Development Project
News

October 29, 2012 · about 13 years ago

UK: Officials Introduce Plans for QEC Development Project

Defence Infrastructure Organisation has announced plans for the Queen Elizabeth Class (QEC) Base Porting Infrastructure Project – HMNB Portsmouth. The project is for the design and construction of a secure tidal berth for the QEC Aircraft Carrier on Middle Slip Jetty comprising upgrading work to the

1 minutes read
  • LinkedIn
  • X
  • Email

Defence Infrastructure Organisation has announced plans for the Queen Elizabeth Class (QEC) Base Porting Infrastructure Project – HMNB Portsmouth.

The project is for the design and construction of a secure tidal berth for the QEC Aircraft Carrier on Middle Slip Jetty comprising upgrading work to the existing jetty to withstand berthing, mooring and operational forces exerted by the QEC and associated operational activities.

This is likely to involve the provision of strong points within the existing jetty structure and the replacement of the load-limited sections of the jetty dating from the 1920s. The QEC will require increased electrical supply at the berth as there is insufficient capacity within HMNB Portsmouth to meet this demand. This increased supply (via the network operator) to a new substation located near to the jetty which will allow transformation and conversion of the supply.

The project will also require reconfiguration of the jetty to provide a potable water supply and other vessel support services, which could involve relocation or protection. Aids to navigation comprising a number of multiple sets of leading lights and navigation beacons, mounted on independent marine structures, are required to enable QEC to safely transit to and from the MSJ berth.

[mappress]

Dredging Today Staff, October 29, 2012; Image: defenseindustrydaily

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago