Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Stone Harbor to Receive Capital Beach Fill Project (USA)
News

November 5, 2012 · about 13 years ago

Stone Harbor to Receive Capital Beach Fill Project (USA)

The Borough of Avalon will receive a significant beach fill project during the winter that will result in at least 140,000 cubic yards of sand being placed on the north end beaches from 9th Street south to 20th Street. If extra options are available to the borough for the project, a total of 190,000

2 minutes read
  • LinkedIn
  • X
  • Email

The Borough of Avalon will receive a significant beach fill project during the winter that will result in at least 140,000 cubic yards of sand being placed on the north end beaches from 9th Street south to 20th Street.

If extra options are available to the borough for the project, a total of 190,000 cubic yards of sand will be placed on the beaches.

“ This will be one of the most significant and important beach fill projects the Borough has conducted in our history”, said Avalon Mayor Martin Pagliughi . “ This base of the beach fill project will be totally financed by the federal government with State and Borough financing only being used if all three options are exercised by Avalon. This will provide us with a large protective and recreational beach heading into the spring and summer seasons of 2013.”

Stone Harbor is poised to receive one of the largest beach fill projects in the borough’s history, up to 260,000 cubic yards of sand to be placed along the beachfront.

“ We are thrilled that the United States Army Corps of Engineers will be conducting this emergency beach fill project in Stone Harbor”, said Stone Harbor Mayor Suzanne Walters who attended the pre-construction meeting at Borough Hall. “Stone Harbor’s beaches were eroded during the Hurricane Irene storm event in 2011, and this emergency beach fill will restore our beaches to conditions that existed before Irene paid us a visit.”

[mappress]

Press Release, November 5, 2012

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago