Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USACE to Hold Public Hearing on Luce Bayou Project (USA)
Business & Finance

November 12, 2012 · about 13 years ago

USACE to Hold Public Hearing on Luce Bayou Project (USA)

The U.S. Army Corps of Engineers Galveston District has published a Draft Environmental Impact Statement for a Department for the Army permit from the Coastal Water Authority’s Luce Bayou Interbasin Transfer project, for which an Environmental Impact Statement will be prepared. The Corps will hold a

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers Galveston District has published a Draft Environmental Impact Statement for a Department for the Army permit from the Coastal Water Authority’s Luce Bayou Interbasin Transfer project, for which an Environmental Impact Statement will be prepared.

The Corps will hold a public scoping meeting Nov. 28, 2012, from 6 p.m. until 8:30 p.m. in the Dayton Community Center at 801 S. Cleveland St., Dayton, Liberty County, Texas.

Staff from the USACE Galveston District and the Coastal Water Authority will be available to answer questions and speak with the public and interested parties regarding concerns and issues that should be considered as the project is studied, evaluated and designed. An open house featuring displays of the proposed project will also be available for public viewing.

The proposed Luce Bayou Interbasin Transfer project includes the following:

– A new water pumping station will be constructed on the Trinity River at Capers Ridge approximately 10 miles north of Dayton, Texas.

– Dual, 108-inch diameter force mains will be constructed extending from the Capers Ridge pump station approximately 3.5 miles to the west and southwest to outfall to the sedimentation settling basin.

– An approximate 20-acre sedimentation settling and storage basin.

– An approximate 23.5 mile clay-lined earthen canal with 4:1 side slopes within a 300- foot easement that would include access roads, berms, chain link perimeter fencing, flow control structures, and metering stations.

– Box culverts at canal and roadway crossings and multiple bawl-ground siphons constructed to facilitate wildlife movement and maintain existing hydrology along the canal conveyance system.

– An approximate 10-acre maintenance facility located approximately six miles north of Dayton, Texas.

– Discharge structure along the southeastern shoreline of Lake Houston.

[mappress]

Press Release, November 12, 2012

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago