Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›UK: Wells Harbour Dredging Underway
News

November 16, 2012 · about 13 years ago

UK: Wells Harbour Dredging Underway

The “Kari Hege” will be engaged in dredging operations in the main channel North of number 4. Vessels will be advised on a daily basis which areas of the channel are safe to navigate. All pre arranged dredging areas are constrained by the weather and wave heights therefore operations are subject to

2 minutes read
  • LinkedIn
  • X
  • Email

The “Kari Hege” will be engaged in dredging operations in the main channel North of number 4.

Vessels will be advised on a daily basis which areas of the channel are safe to navigate. All pre arranged dredging areas are constrained by the weather and wave heights therefore operations are subject to change on a daily basis.

The Port’s dredger “Kari Hege” operates from Monday to Friday. Its normal area of work is in the main channel between buoy number 12 and buoy number 1. It works during the low water period, starting three hours after high water until three hours prior to the next high water.

The “Kari Hege” will manoeuvre into its dig position, or back to its mooring, approximately half an hour before or after this time. Any larger vessels intending to pass the “Kari Hege” in the channel during digging operations or while it is manoeuvring should call the dredger up on Channel 12 to ascertain which is the safe side to pass.

All material removed from the channel during dredging operation is placed on the berm which is marked by the Port hand channel buoys. Areas to be dredged are dictated by regular survey results but these areas are subject to weather constraints. On occasions the “Kari Hege” carries out works in the channel and on the dams south of the Life Boat house towards Wells Quay.

This will normally coincide with periods of adverse weather when it is too unsafe to operate in the main channel.

[mappress]

Press Release, November 16, 2012

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago