Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Croatia: Plan for Osijek Port Development Unveiled
Business & Finance

November 23, 2012 · about 13 years ago

Croatia: Plan for Osijek Port Development Unveiled

The Central Finance and Contracting Agency has introduced plans for the port of Osijek development program. This project aims to modernise and increase the capacity of the port of Osijek situated on the right bank of the river Drava tributary of the river Danube, the pan-European corridor No VII. Th

2 minutes read
  • LinkedIn
  • X
  • Email

The Central Finance and Contracting Agency has introduced plans for the port of Osijek development program.

This project aims to modernise and increase the capacity of the port of Osijek situated on the right bank of the river Drava tributary of the river Danube, the pan-European corridor No VII.

The necessary works for the building and reconstruction of the south quay in the port of Osijek are the following:

– Construction of the port traffic surfaces and infrastructure;

– Construction of the container terminal based on the LoLo technology of trans-shipments with the gantry crane;

– Construction of the RoRo terminal for trans-shipment of trucks, tugs with semi-trailer and other vehicles with independent drive;

– Reconstruction of the existing vertical and inclined quay.

The purpose of this contract is to prepare and develop all the necessary technical documentation for construction works in accordance with the requirements of the EU and national legislation in order to propose the project for EU co-financing.

On the basis of the existing documentation (the feasibility study, cost-benefit analysis, the environmental impact assessment study and the conceptual design), the following documents will be prepared:

– Main design of all civil and track works for building and reconstruction of the south quay in the port of Osijek; Detailed design on the basis of the main design;

– Tender dossiers for works and supervision activities;

– IPA/CF project application.

The deadline for this tender is December 18, 2012, and the project value is 1,300,000 EUR.

The project period is 12 months from the date of contract award.

[mappress]

Dredging Today Staff, November 23, 2012

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free