Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›UK: River Mersey Dredging Plan Introduced
News

November 23, 2012 · about 13 years ago

UK: River Mersey Dredging Plan Introduced

The Mersey Docks and Harbour Company Limited has announced details about the River Mersey approach channel dredging contract. The project will include deepening, and if required, widening of the River Mersey existing approach channel to the Port of Liverpool between the bar at the outer end of the c

2 minutes read
  • LinkedIn
  • X
  • Email

The Mersey Docks and Harbour Company Limited has announced details about the River Mersey approach channel dredging contract.

The project will include deepening, and if required, widening of the River Mersey existing approach channel to the Port of Liverpool between the bar at the outer end of the channel and the Port of Liverpool.

It is estimated that the total volume of dredged material will be between 4,500,000 m3 and 5,000,000 m3. The minimum required bed level of the approach channel following dredging is 8.0m below Chart Datum (bCD). The channel has historically been dredged to this level although currently the existing approach channel has a maintained depth of circa 6.9m bCD.

The contractor will be required to carry out bathymetric surveys before, during and after the works to verify sea bed levels. Depending on the final dredge profile of the channel there may be a requirement to reposition and/or replace some of the channel marker buoys. It is envisaged that the dredged material will be transported to designated disposal sites in the Irish Sea, as well as two other local marine sites.

There may be a requirement to interface with the contractor constructing the new quay wall and the associated land reclamation for The Mersey Docks and Harbour Company Ltd (MDHC) at the Port of Liverpool.

This requirement may be that a portion of the dredged material, suitable for use as reclamation material, will be supplied to the contractor carrying out the quay wall and reclamation works on behalf of MDHC.

The deadline for the requests of documents is December 20, 2012, and value of this project is between £20,000,000 and £40,000,000

The project period is 12 months from the date of contract award.

[mappress]

Dredging Today Staff, November 23, 2012

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago