Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Corps Releasing Water from Carlyle Lake to Secure Mississippi River Traffic (USA)
News

December 19, 2012 · about 13 years ago

Corps Releasing Water from Carlyle Lake to Secure Mississippi River Traffic (USA)

The U.S. Army Corps of Engineers St. Louis District began increasing releases from Carlyle Lake yesterday in support of safe navigation on the Mississippi River. Water from the lake will help provide the depth necessary for river commerce to pass Thebes, Ill., where rock formations pose a risk to na

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers St. Louis District began increasing releases from Carlyle Lake yesterday in support of safe navigation on the Mississippi River.

Water from the lake will help provide the depth necessary for river commerce to pass Thebes, Ill., where rock formations pose a risk to navigation at -5 feet and below on the St. Louis gage. Carlyle Lake is located on the Kaskaskia River system in Southwest Illinois.

Carlyle Lake is one of few Corps reservoirs able to significantly capture water above its seasonal pool level to support navigation during the current drought. Maj. Gen John Peabody, Mississippi Valley Division commander , authorized all the lakes on the Upper Mississippi River system to hold an additional 10 percent above seasonal pool levels October 17 in anticipation of historic low levels on the Middle Mississippi.

Releases from Carlyle Lake began late Saturday, and will increase gradually to 4,000 cubic feet per second by Monday afternoon. The full extent of the releases is expected to reach Thebes by Dec. 24. This will provide an additional six inches of depth in this critical reach of the river. Releases will continue if needed until the river level increases through precipitation, or until Carlyle Lake reaches its winter pool elevation. With the additional release schedule, Carlyle Lake is expected to reach its winter pool level in approximately three weeks

“ With the Mississippi River watershed receiving less rain than forecasted, we are working to provide the water depth needed at a time when inches make a difference, ” Peabody said. “ We’ll continue to work closely with the navigation industry and our partners in the U.S. Coast Guard to keep the vital artery for commerce open. ”

The releases are one of many measures the Corps and the U.S. Coast Guard are using in coordination with river industry to keep commerce moving during the drought. Additional measures include removing rock along the riverbed near Thebes, which is expected to begin this week. This work will provide a permanent improvement to the Middle Mississippi and will reduce risk to river traffic in low water. Additionally, dredging has been ongoing since early July, with the U.S. Army Dredge Potter moving more than 6 million cubic yards of sediment out of the navigation channel.

[mappress] Press Release, December 19, 2012; Image: usace

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago