Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Brazil: FCC Bags Açu Superport Expansion Deal
News

December 21, 2012 · about 13 years ago

Brazil: FCC Bags Açu Superport Expansion Deal

FCC, the Citizen Services Group, has further strengthened its position in key Latin American countries with its first major contract in Brazil. FCC will expand the Açu Superport, located 315 kilometres north of Rio de Janeiro. The contract, which is worth more than 407 million euro, has an execution

2 minutes read
  • LinkedIn
  • X
  • Email

FCC, the Citizen Services Group, has further strengthened its position in key Latin American countries with its first major contract in Brazil.

FCC will expand the Açu Superport, located 315 kilometres north of Rio de Janeiro. The contract, which is worth more than 407 million euro, has an execution period of 32 months and includes the construction of the port’s TX1 terminal. Açu is located in the northeastern province of São João da Barra, which produces 85% of Brazil’s oil and gas. The project includes the extension of a recently-built pier which requires a new breakwater to become operational.

FCC heads the consortium that will complete this large and complex civil engineering project. The new breakwater will measure almost 2.5 kilometres in length and more than 20 metres in height. The contract also includes other activities, such as dredging more than 4.1 million cubic metres to an average depth of 31 metres, pier superstructure works, and the provision of nautical equipment and buoys.

In view of the complexity of the new breakwater, the first nine components (caissons) will be built in Algeciras (Cádiz), since the Brazilian port lacks the necessary facilities for their construction. The caissons will then be transported to Açu on semi-submersible vessels; the trip will last 15 days and cover 4,300 nautical miles (7,960 kilometres).

The port is located inside the Açu Superport industrial complex, which spans 90 square kilometres (2.5 times the size of Manhattan), and will comprise 2 terminals with 17 kilometres of pier and 40 berths, capable of receiving ships of up to 400,000 tonnes.

The new facilities will be equipped to receive shipments of iron, oil, steel, coal and granite, and will be able to accommodate Capesize vessels, over 220,000 tonnes. The new Açu Superport will greatly benefit the oil and gas industry due to its proximity to the Campos Basin, one of Brazil’s top crude production zones. The port is expected to handle 350 million tonnes of cargo annually once construction is completed.

This contract was awarded by LLX, a logistics company, and Minas-Rio, the Brazilian subsidiary of multinational Anglo American. LLX, which belongs to EBX Group, is owned by Eike Batista, the eighth richest man in the world according to Forbes magazine. Anglo American, a leading mining company with operations worldwide, specialises in the extraction of platinum, diamonds, copper, nickel, iron ore and coal.

[mappress]

Press Release, December 21, 2012; Image: llx

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago