Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USA: Army Corps Unveils Plan for Upper Mississippi River Pool 4
Business & Finance

December 27, 2012 · about 13 years ago

USA: Army Corps Unveils Plan for Upper Mississippi River Pool 4

The U.S. Army Corps of Engineers, St. Paul District, will be issuing a solicitation in 2013 for removal of dredge material from transfer sites located in Upper Mississippi River Pool 4. Traditionally the Corps has awarded contracts for this type of activity via an invitation for bid (IFB) that provi

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, St. Paul District, will be issuing a solicitation in 2013 for removal of dredge material from transfer sites located in Upper Mississippi River Pool 4.

Traditionally the Corps has awarded contracts for this type of activity via an invitation for bid (IFB) that provided detailed plans and specifications regarding the method, route and ultimate destination for the material to be removed. The Corps is currently considering alternate methods of accomplishing the removal of material from the transfer sites.

One of the methods being considered is a sealed bid solicitation that specifies a performance requirement to remove and dispose of a given volume of material to a location (or for a use) identified and determined by the contractor. Upon removal of the dredged material, the contractor would take title to the material to be disposed of and is free to use or dispose of the material in any lawful manner.

The traditional disposal sites provided by the Government would not be available for use by the contractor.

This alternative solicitation method would leave it to the contractor to determine the most cost effective method of disposing of the material appropriately. The contractor would be responsible for obtaining all necessary permits and approvals to dispose of the materials removed or put them into some other use.

More info

[mappress]

Press Release, December 27, 2012

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago