Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Prolec System Effective in Dredging Application (Germany)
News

January 8, 2013 · about 13 years ago

Prolec System Effective in Dredging Application (Germany)

Prolec has recently supplied its Digmaster Pro system to the German Federal Waterways and Shipping Administration during an upgrade of its workboat fleet. The German inland waterway network stretches for around 7300 km. Larger rivers have been canalised, allowing large ships to navigate them. Not su

2 minutes read
  • LinkedIn
  • X
  • Email

Prolec has recently supplied its Digmaster Pro system to the German Federal Waterways and Shipping Administration during an upgrade of its workboat fleet.

The German inland waterway network stretches for around 7300 km. Larger rivers have been canalised, allowing large ships to navigate them. Not surprisingly then, the network is crucial for the German economy – not only is it well-used by tourists and holiday makers, but more than half of it is of considerable importance to international freight transport.

The network of waterways is managed by the German Federal Waterways and Shipping Administration. The office is made up of seven regional shipping directorates responsible for maintaining the rivers, canals, locks and seaward approaches, and managing shipping traffic.

The Federal Waterways office is currently upgrading its workboat fleet. In August last year, the clamshell dredger Elsflether Sand was brought into service in the WSA Bremen district, to be used in the management of the river Weser. This craft is a replacement for older, decommissioned vessels, and is intended to increase the efficiency of the waterways’ working cycles. This particular boat was built in Denmark where it was equipped with a permanently fixed Hitachi Zaxis 470 LCH supplied by Kiesel Baumaschinen Nord. It has a total reach of 17 metres and is being predominantly used for dredging.

In order to meet its working requirements, the boat was fitted with a Prolec Digmaster Pro depth monitoring and guidance system by German distributor Illig Lasersysteme. The system uses fully submersible angle sensor technology to allow the operator to dig out only the necessary material to bring the waterway back to the required depth for all tidal situations.

The ship’s system is also configured to enable the construction of works such as breakwaters or laying sealing material in shipping channels within preset parameters.

Prolec Sales Manager for Scandinavia, Central and Easterm Europe, Jurgen Reineke , says,” We are pleased to be helping the German Federal Waterways and Shipping Administration find ways to work more efficiently and accurately in their dredging and marine construction work. Our Digmaster Pro system has been designed to meet the requirements of this specialised application, and is proving effective in this environment .”

The Elsflether Sand is now one of four new vessels supplied to the German Federal Waterways and Shipping Administration using this Prolec system. The others are based in Emden, Dresden and Berlin.

Jurgen Reineke says, “ We’re looking forward to a continued relationship where we can work together with this forward thinking organisation, using our tools to increase productivity in a dredging application and, by association, help to keep the German waterways running smoothly .”

[mappress]

Press Release, January 8, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago