Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Quadra Marina Dredging Plan Step Closer to Realization (Canada)
News

January 8, 2013 · about 13 years ago

Quadra Marina Dredging Plan Step Closer to Realization (Canada)

The Honourable Peter MacKay, Minister of National Defence, announced three contract awards for general maintenance at 19 Wing Comox. The overall value of the contracts is approximately $1.22 million. “The Government of Canada is determined to improve infrastructure across the Canadian Armed Forces a

2 minutes read
  • LinkedIn
  • X
  • Email

The Honourable Peter MacKay, Minister of National Defence, announced three contract awards for general maintenance at 19 Wing Comox.

The overall value of the contracts is approximately $1.22 million.

“ The Government of Canada is determined to improve infrastructure across the Canadian Armed Forces and is moving forward on these much needed projects ,” said Minister MacKay.

The contract awards for general maintenance include:

-the minor recapitalization of “JJ” style housing which was awarded to Comox Consolidators Limited for $437 000;

-upgrades to siding on Department of National Defence housing which was awarded to Hand and Hammer Contracting for $229 400; and

-the dredging of the Quadra Marina which was awarded to JJM Construction Limited for $557 808.

Quadra Marina Project Description:

The project involves the maintenance dredging of four discrete zones under and around the CFB Comox Cadet small boat marina and fuel float. The total volume of marine sediments to be dredged is estimated to be 7,616 cubic metres. The dredged sediment will be transported by barge to the nearby Cape Lazo disposal at sea site for off-loading and disposal. The project also involves temporarily removing sections of the marina floats and fuel dock floats to provide access for dredging. Once the dredging is complete, the floats will be re-installed with new timber piles. The scope of work includes dredging, timber pile removal, supply & install new timber piles, re & re of electrical, water, fuel lines, and dock floats.

“ I am proud that our Government is investing in the modernization of our Canadian Armed Forces’ infrastructure, and in encouraging our local industry on Vancouver Island, ” said the Honourable John Duncan, Minister of Aboriginal Affairs and Northern Development and Member of Parliament for Vancouver Island North .

The Canadian Armed Forces is a first-class, modern military delivering excellence at home and is a strong and reliable partner in the defence of North America making meaningful contributions to international security.

The Government of Canada conducted open, fair, and transparent competition processes to award contracts for these projects.

[mappress]

Press Release, January 8, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago