Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Another Milestone for Panama Canal Expansion Program
News

January 17, 2013 · about 13 years ago

Another Milestone for Panama Canal Expansion Program

The Panama Canal Expansion Program has achieved yet another important milestone with the arrival of the first shipment of valves that will be used for the operation of the Third Set of Locks. The valves where built in South Korea by Hyundai Samho Heavy Industries. “This marks a new milestone for the

2 minutes read
  • LinkedIn
  • X
  • Email

The Panama Canal Expansion Program has achieved yet another important milestone with the arrival of the first shipment of valves that will be used for the operation of the Third Set of Locks. The valves where built in South Korea by Hyundai Samho Heavy Industries.

“This marks a new milestone for the Panama Canal expansion works, particularly for the construction of the new locks, ” Panama Canal Administrator Jorge L. Quijano said.

The first shipment includes 47 valves that are part of the Post-Panamax locks electromechanical system that will regulate water flow between the chambers, the culverts and water-saving basin conduits. On board the vessel BCC England, the heavy cargo’s one-month journey was completed last week.

In addition to the valves, the shipment included eight bulkheads of different types for the new locks and four trash racks that will be installed on the wing-walls along the water intakes to avoid the passage of debris from the lake and into the locks chambers.

The valves, bulkheads and trash racks first arrived at Manzanillo International Terminal facilities, in the Colon province, and were later on transported by land on flat-bed trucks. A total of 36 elements were delivered to the expansion site on the Atlantic side and 23 to Pacific site. A total weight of 1,304.49 tons of steel was transported during the seven-day operation.

Local companies subcontracted by Hyundai, handled the logistics, land-based transportation and unloading of the valves.

The Panama Canal Administrator highlighted the professionalism with which the operation was conducted, and the experience gained by the local heavy equipment operators and logistics specialists handling elements never before seen in the country.

A second shipment is scheduled to arrive at the end of January.

By the end of 2013, a total of 158 valves (culvert, equalization and conduit), 84 bulkheads and 328 trash racks will have arrived for the project.

[mappress]

Press Release, January 17, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago