Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Deltares: Repair Work Moves Ahead on De Blauwe Dromer (The Netherlands)
Business & Finance

January 17, 2013 · about 13 years ago

Deltares: Repair Work Moves Ahead on De Blauwe Dromer (The Netherlands)

The repair work on the lock ‘De Blauwe Dromer’ near Zeewolde/Harderwijk is making steady progress. The temporary dam required to do the work safely is now being installed. The repair work is being done for the provincial authority of Flevoland by the Van den Herik contracting company. Deltares, the

2 minutes read
  • LinkedIn
  • X
  • Email

The repair work on the lock ‘De Blauwe Dromer’ near Zeewolde/Harderwijk is making steady progress.

The temporary dam required to do the work safely is now being installed. The repair work is being done for the provincial authority of Flevoland by the Van den Herik contracting company. Deltares, the research institute for water, subsurface and infrastructure, is the technical consultant.

The provincial authority of Flevoland closed ‘De Blauwe Dromer’ (near the Lovink pumping station in the direction of Harderwijk) on Monday, 15 October 2012 because of the risk of the lock subsiding. The problem is groundwater seeping upwards under the lock. This phenomenon can be found anywhere but it can be a threat in the vicinity of a lock because the water can wash away sand, making the lock unstable.

The situation near the lock is highly complex and so the provincial authority called in Deltares last year to provide specialist advice.

Deltares recommended three measures:

– using Biosealing to stop the flow of deep groundwater upwards through the clay layer. Biosealing is an advanced technique developed by Deltares involving the injection of special bacteria that seal off the hole in the clay layer.

– the injection of grout below the concrete bottom to repair the foundations that have been undermined by the washing away of the sand. The holes are closed off, and so the sand is kept in place.

– ballasting the ground in the polder by positioning extremely heavy concrete blocks on permeable sheeting to prevent sand being washed away.

To ensure that the work can be done safely, a temporary dam is being installed in the Hoge Dwarsvaart canal. The work will be completed in the course of spring.

[mappress]

Press Release, January 17, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago