Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Rockaway Inlet Dredging Plan Introduced (USA)
Business & Finance

January 28, 2013 · about 13 years ago

Rockaway Inlet Dredging Plan Introduced (USA)

The New York District Army Corps of Engineers proposes to perform emergency dredging and beach nourishment for the Atlantic Coast of New York City, East Rockaway Inlet to Rockaway Inlet and Jamaica Bay Project, New York. The work consists of dredging of the Federal Navigation channel and deposition

1 minutes read
  • LinkedIn
  • X
  • Email

The New York District Army Corps of Engineers proposes to perform emergency dredging and beach nourishment for the Atlantic Coast of New York City, East Rockaway Inlet to Rockaway Inlet and Jamaica Bay Project, New York.

The work consists of dredging of the Federal Navigation channel and deposition basins at East Rockaway Inlet and the Federal Navigation Channel at Jamaica Bay with subsequent placement of the dredged material as nourishment along the designated feeder beach (Rockaway Beach, Queens County. NY).

The proposed maintenance dredging and beach nourishment work would involve a Basic Schedule that requires dredging and placement of approximately 1,500,000 cubic yards of material at Rockaway Beach. The East Rockaway Inlet project is scheduled to be dredged to a depth of 14 feet plus 2 feet allowable over-depth or deeper based on the availability of material. The Rockaway Inlet Federal Navigation Channel is scheduled to be dredged to a depth of 20 feet plus 2 feet allowable over-depth or deeper based on the availability of material.

The material dredged from the Inlets will be place along the Rockaway Beaches, approximately between Beach 19th Street and Beach 149th Street. The proposed work can be performed by either a pipeline or hopper dredge with pump-out capacity and an ability to withstand open ocean conditions.

More info

[mappress]

Dredging Today Staff, January 28, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago