Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›USA: Hatteras Ferry Channel Dredging Makes Progress
News

January 29, 2013 · about 13 years ago

USA: Hatteras Ferry Channel Dredging Makes Progress

Since the Hatteras-Ocracoke ferry route suspended operations Jan. 18, progress has been made by the contractor hired by the U.S. Army Corps of Engineers to dredge the federal channel. The project began Dec. 1, 2012, and since that time the contractor has removed 76,751 cubic yards of material to a r

1 minutes read
  • LinkedIn
  • X
  • Email

Since the Hatteras-Ocracoke ferry route suspended operations Jan. 18, progress has been made by the contractor hired by the U.S. Army Corps of Engineers to dredge the federal channel.

The project began Dec. 1, 2012, and since that time the contractor has removed 76,751 cubic yards of material to a required depth of 10-feet, with two feet of over dredging.

The Dredge Richmond, owned by Cottrell Contracting, is now located in the vicinity of navigation aid 9A. The project is approximately 60 percent complete by quantity.

[mappress]

Press Release, January 29, 2013; Image: cottrellcontracting

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

The digital deckhand for shipping that keeps a 24/7 watch over vessels
News

The digital deckhand for shipping that keeps a 24/7 watch over vessels

about 8 months ago

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The digital deckhand for shipping that keeps a 24/7 watch over vessels
News

The digital deckhand for shipping that keeps a 24/7 watch over vessels

about 8 months ago
Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago