Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USA: Contractor Sought for Housatonic River Cleanup Project
Business & Finance

January 31, 2013 · about 13 years ago

USA: Contractor Sought for Housatonic River Cleanup Project

The U.S. Army Corps of Engineers, New England District is issuing this Sources Sought Announcement to determine interest, availability and capability of 8(a), HUBZone, Service-Disabled Veteran-Owned, Economically Disadvantaged Women-Owned Small Business and Small Business concerns. Contract scope wi

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, New England District is issuing this Sources Sought Announcement to determine interest, availability and capability of 8(a), HUBZone, Service-Disabled Veteran-Owned, Economically Disadvantaged Women-Owned Small Business and Small Business concerns.

Contract scope will include oversight of GE-lead remedial and removal actions at the Site including the Rest-of-River Reach (river sediment, banks and floodplain soil downstream of the confluence of the East and West Branches of the Housatonic River), the Upper 1/2 Mile Reach, the 1-1/2 Mile Reach, floodplains associated with the upper 2 mile reaches, the GE Plant site, Silver Lake, Former Oxbow Areas, Allendale School, groundwater, and other areas impacted by GE’s operations.

Technical services include, but are not limited to, site characterization, removal investigations, feasibility studies, review of designs, oversight of removal/remediation actions, (including sediment remediation activities such as dredging, excavation, and stream restoration) litigation support, oversight of other GE activities, including post removal site control actions, groundwater investigation, monitoring, assessment and response actions, and any other actions necessary to provide oversight of removal/remediation activities at this site.

The estimated total cost of the project is $25 Million. Work will begin in May 2014 and will extend over a 5 year period and is for technical oversight of response actions performed by General Electric (GE) and their contractors at the GE-Pittsfield/Housatonic River Site, Massachusetts (Site).

More info

[mappress]

Dredging Today Staff, January 31, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago