Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Santa Ana River Marsh Dredging Underway (USA)
News

February 18, 2013 · about 13 years ago

Santa Ana River Marsh Dredging Underway (USA)

The U.S. Army Corps of Engineers, Los Angeles District, has hired a contractor to remove sediment along the channels in the Santa Ana River Marsh. The project will restore design channel depths to improve circulation and tidal flushing – both necessary to maintain the salt marsh habitat which includ

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, Los Angeles District, has hired a contractor to remove sediment along the channels in the Santa Ana River Marsh.

The project will restore design channel depths to improve circulation and tidal flushing – both necessary to maintain the salt marsh habitat which includes many endangered species.

The Corps’ project also includes a beach sand replenishment component. Good quality sand will be pumped through a pipeline to the nearshore, located 1,000 feet offshore from 60th Street. The sands have been thoroughly tested and approved by EPA for placement in the nearshore environment. Area residents and beach visitors will see that a temporary pipeline is in place and runs from the Marsh parallel to the Santa Ana River, then down along the beach and through the surf zone to the approved nearshore disposal location. Sand pumping started last week and is set to continue for about two weeks. The temporary pipe is expected to be removed during the week of February 25.

Sediment not compatible for beach replenishment will be excavated and disposed of at an upland landfill. The California least tern island within the Marsh will also be cleared of weedy vegetation to improve the nesting habitat of this endangered species.

The proposed dredging and excavation is scheduled to be completed by the end of March 2013.

[mappress]

Press Release, February 18, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago