Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›VIDEO: “Pat M” at Work in La Guaira (Venezuela)
News

February 20, 2013 · about 13 years ago

VIDEO: “Pat M” at Work in La Guaira (Venezuela)

The backhoe dredger ‘Pat M’ working in La Guaira, Venezuela, loading the split barge Desterro, during works for the port’s new Container Terminal currently under construction. The film was made on 16th February and shows the dredger in action loading the barge, and also a few shots of the revolution

1 minutes read
  • LinkedIn
  • X
  • Email

The backhoe dredger ‘Pat M’ working in La Guaira, Venezuela, loading the split barge Desterro, during works for the port’s new Container Terminal currently under construction.

The film was made on 16th February and shows the dredger in action loading the barge, and also a few shots of the revolutionary dredge software from Foreshore Technology , with the 3D imagery of the dredged area.

‘Pat M’ is working in approximately 11m of water, with a final dredge depth on -18m, so there is approximately 7m of sand, rock and silt to be removed.

[mappress]

Dredging Today Staff, February 20, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

The digital deckhand for shipping that keeps a 24/7 watch over vessels
News

The digital deckhand for shipping that keeps a 24/7 watch over vessels

about 8 months ago

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The digital deckhand for shipping that keeps a 24/7 watch over vessels
News

The digital deckhand for shipping that keeps a 24/7 watch over vessels

about 8 months ago
Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago