Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Belgium: Waasland Canal Development Work Begins
News

February 28, 2013 · about 13 years ago

Belgium: Waasland Canal Development Work Begins

Construction work has started on a new 645 m quay at the head of the Waasland canal, in the port area on the left bank. The new quay will have a projecting platform with a width of 65 m to permit mooring, loading and unloading of ro/ro vessels. On the West side of the Waasland […]

2 minutes read
  • LinkedIn
  • X
  • Email

Construction work has started on a new 645 m quay at the head of the Waasland canal, in the port area on the left bank.

The new quay will have a projecting platform with a width of 65 m to permit mooring, loading and unloading of ro/ro vessels.

On the West side of the Waasland port (the Antwerp port area on the left bank of the Scheldt), at the junction of the Verrebroek and Doel docks, a new quay with a length of around 645 metres is being built. The quay is of the combi-wall type, having tubular piles with sheet piles between them, with a reinforced concrete deck on top and anchored by MV piles (heavy ground anchors).

The new quay will have a projecting platform with a width of 65 m to permit mooring, loading and unloading of ro/ro vessels.

The quay will offer a depth alongside of 18 m. Some 500,000 m³ of sand and 300,000 m³ of other spoil unsuitable for recycling in the construction industry will be dredged away to create this depth. The construction work is expected to take about 24 months, and the dredging will start once this has been completed.

The project also includes construction of a talus with water plants growing on it over a length of 50 m at the East end of the Doel dock, as part of a trial project. Taking this into account also, the complete work should be finished by the end of 2014.

[mappress]

Press Release, February 28, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago