Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Mill Creek Landing Closed for Dredging (USA)
News

February 28, 2013 · about 13 years ago

Mill Creek Landing Closed for Dredging (USA)

The Virginia Department of Game and Inland Fisheries (DGIF) closed Mill Creek Landing at Wake on the Rappahannock River through April to dredge sand from the front and inside of the boat ramp and install sheet piling to inhibit further sand accumulation. This dredging program is expected to be finis

1 minutes read
  • LinkedIn
  • X
  • Email

The Virginia Department of Game and Inland Fisheries (DGIF) closed Mill Creek Landing at Wake on the Rappahannock River through April to dredge sand from the front and inside of the boat ramp and install sheet piling to inhibit further sand accumulation.

This dredging program is expected to be finished by mid-March and the landing reopened by mid-April, according to ssentinel.com.

After dredging, a hydrographic survey will have to be conducted to determine the quantity of sand removed and depth verification, said DGIF spokesperson Ed Carr.

[mappress]

Dredging Today Staff, February 28, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

The digital deckhand for shipping that keeps a 24/7 watch over vessels
News

The digital deckhand for shipping that keeps a 24/7 watch over vessels

about 8 months ago

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The digital deckhand for shipping that keeps a 24/7 watch over vessels
News

The digital deckhand for shipping that keeps a 24/7 watch over vessels

about 8 months ago
Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago