Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USA: Savannah and Brunswick Dredging Plans Move Ahead
Business & Finance

March 1, 2013 · about 13 years ago

USA: Savannah and Brunswick Dredging Plans Move Ahead

The U.S. Army Corps of Engineers, Savannah District, is conducting preliminary research to determine the market capabilities of potential contractors to perform maintenance dredging in the Savannah, GA and Brunswick, GA Inner Harbors. The dredge must have the capability to dredged to a depth of -62′

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, Savannah District, is conducting preliminary research to determine the market capabilities of potential contractors to perform maintenance dredging in the Savannah, GA and Brunswick, GA Inner Harbors.

The dredge must have the capability to dredged to a depth of -62′ MLLW and pump the material a total distance of approximately 50,000 linear feet and then up an approximate 40 ft relative to (MLLW) dike embankment with another 4,000 linear feet to the disposal area head section location.

A segment of harbor dredging will include pumping hard packed sand approximately 30,000 linear feet and then up an approximate 30 ft relative to (MLLW) dike embankment.

Sufficient pipe must be available for the required pumping distance and booster pumps will be allowed. QCS will be required.

An equipment list and capability of each piece of equipment to be used in the work is required. Equipment specified must be capable of performing the work required. Examples of capability include depth to which the dredge can reach and length of pipeline to which a dredge can pump.

Dredging will take place in harbors with diurnal tidal cycles. Maximum tides in non-storm conditions may reach 12 ft. Average flows to be expected are about 1.5 to 3 ft./sec. with maximum flows of about 4 ft./sec.

More info

[mappress]

Source: fbo.gov, March 1, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago