Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›UK: Italdraghe Returns to Seawork
News

March 7, 2013 · about 13 years ago

UK: Italdraghe Returns to Seawork

Italy’s leading dredger builder, Italdraghe SpA, returns to Seawork this year to preview its new range of innovative Marina Master cutter suction dredgers, designed in conjunction with fellow exhibitor Goodchild Marine (UK). The first dredger will be on the pontoons at Seawork: This exceptionally ve

1 minutes read
  • LinkedIn
  • X
  • Email

Italy’s leading dredger builder, Italdraghe SpA, returns to Seawork this year to preview its new range of innovative Marina Master cutter suction dredgers, designed in conjunction with fellow exhibitor Goodchild Marine (UK).

The first dredger will be on the pontoons at Seawork: This exceptionally versatile and manoeuvrable dredger is perfect for precision dredging projects in marinas and narrow waterways where disruption needs to be kept to a minimum. No wires are required and the dredger can even operate inside marina finger berths.

The very first MarinaMaster 8000 will be delivered to the UK in March and will be set to work straight away de-silting the Yacht Haven’s harbour at North Fambridge in Essex.

Being self-propelled, the MarinaMaster 8000 can navigate independently on the water between dredging sites. A key feature of this unique dredger is the two sponsons positioned longitudinally for transportation and then hinged outwards to ensure stability during dredging operations. The width is only 4.1 metres when being transported by road.

All features of the MarinaMaster 8000 are designed to be controlled by one crewmember from the sound-proofed, heated, air-conditioned, control cabin mounted above the dredge arm.

Maintenance or replacement of essential systems is simple and quick to carry out, even the pipe-handling hydraulic crane at the stern is carefully sited to allow it to be used to lift the dredge pump and other machinery space components when required.

[mappress]

Source: seawork, March 7, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago