Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USA: Officials Introduce Dredging Plan for Rockaway Beach
Business & Finance

March 7, 2013 · about 13 years ago

USA: Officials Introduce Dredging Plan for Rockaway Beach

The US Army Corps of Engineers, New York District intends to issue an Invitation for Bids (IFB) for dredging of Rockaway Beach and Coney Island. The Rockaway Beach project is located along the southern margin of the Borough of Queens, City of New York, and extends from Beach 149th Street to Beach 19

2 minutes read
  • LinkedIn
  • X
  • Email

The US Army Corps of Engineers, New York District intends to issue an Invitation for Bids (IFB) for dredging of Rockaway Beach and Coney Island.

The Rockaway Beach project is located along the southern margin of the Borough of Queens, City of New York, and extends from Beach 149th Street to Beach 19th Street and encompasses approximately 6.2 miles of shoreline in the Borough of Queens, New York.

The proposed work includes placement of beachfill along the length of the constructed Project footprint. The estimated quantity of beachfill of 3.5 million CY along the length of the constructed project is necessary in order to restore the Project to its original as-built conditions. The sand material will be dredged from the East Rockaway Inlet, Rockaway Inlet, Jamaica Bay and/or an offshore borrow area located 3-5 miles off the Rockaways, and hydraulically pumped to the project site.

The Coney Island project area lies along the Atlantic Ocean Shoreline in the Borough of Brooklyn, City of New York, between Rockaway Inlet and Norton Point and the constructed project encompasses approximately 13,500 ft. along the public beach as well as approximately 2,300 ft along the area of Sea Gate.

This project includes the constructed beach, the terminal groin at West 37th Street, the revetment and fillet in Sea Gate protecting the groin, three outfall extensions, a retaining wall along the West 25th St. vehicular access, and a valve chamber at Stillwell Ave.

More info

[mappress]

Source: fbo.gov, March 7, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago