Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USA: Corps Announces Mississippi River Dredging Plan
Business & Finance

March 28, 2013 · about 13 years ago

USA: Corps Announces Mississippi River Dredging Plan

U.S. Army Corps of Engineers has announced a plan for the Mississippi River dredging project. The work will consist of placing hydraulically dredged material taken from a borrow area located on the river bottom. Maximum height of the sill will be the point at which the settled dredge material at the

1 minutes read
  • LinkedIn
  • X
  • Email

U.S. Army Corps of Engineers has announced a plan for the Mississippi River dredging project.

The work will consist of placing hydraulically dredged material taken from a borrow area located on the river bottom.

Maximum height of the sill will be the point at which the settled dredge material at the disposal area reaches a maximum height of -45 feet NGVD along the entire length of the sill.

The estimated time for the completion is 89 calendar days. The estimated value of this work is between $5,000,000.00 and $10,000,000.00.

The solicitation for this development program will be issued on or about 11 April 2013.

More info

[mappress]

Source: fbo.gov, March 28, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago