Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USA: DMCA Development Project Introduced
Business & Finance

March 30, 2013 · about 13 years ago

USA: DMCA Development Project Introduced

U.S. Army Corps of Engineers has announced a plan for the Dredge Material Containment Area (DMCA) 14B development project, Savannah Harbor, Jasper County. This project includes the raising of the existing perimeter containment dike of the Dredge Material Containment Area (DMCA) 14B. The perimeter di

1 minutes read
  • LinkedIn
  • X
  • Email

U.S. Army Corps of Engineers has announced a plan for the Dredge Material Containment Area (DMCA) 14B development project, Savannah Harbor, Jasper County.

This project includes the raising of the existing perimeter containment dike of the Dredge Material Containment Area (DMCA) 14B. The perimeter dike spans a length of 25,000 feet.

The crest of the quote mark front dike, quote mark or the stretch of dike that parallels the Savannah River, is currently at an approximate elevation of 33 feet MLLW. The quote mark back dike, quote mark or stretch of dike that’s opposite the front dike, is currently at elevation 25 feet MLLW.

The cross dikes transition in elevation from 33 to 25 feet MLLW. This project will involve raising the current dike approximately 6 feet in height to an elevation range of 31 to 39 feet MLLW. The construction of the new dike will be on the interior slope of the existing dike. The design also includes a stability berm/counterweight on the inside toe of the new dike from Stations 52+00 to 157+00.

Approximately 760,000 cubic yards (CY) of fill material will be required for the raising. This estimate includes the volume required to fill the template (560,000 CY) and accounts for any settlement or displacement that will occur during or prior to construction (200,000 CY).

Fill material will be obtained from the interior of DMCA 14B.

More info

[mappress]

Source: fbo.gov; March 31, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago