Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Corps OKs Project Implementation Reports for Brevard Beaches (USA)
Business & Finance

April 1, 2013 · about 13 years ago

Corps OKs Project Implementation Reports for Brevard Beaches (USA)

The U.S. Army Corps of Engineers has approved Project Implementation Reports that will result in renourishment of North and South Reach beaches in Brevard County, with the federal government footing virtually 100 percent of the estimated $29.3 million cost to restore parts of the county’s eroded sho

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers has approved Project Implementation Reports that will result in renourishment of North and South Reach beaches in Brevard County, with the federal government footing virtually 100 percent of the estimated $29.3 million cost to restore parts of the county’s eroded shoreline.

In late October 2012, Hurricane Sandy caused high winds and seas that damaged Brevard County beaches. The County worked with the U.S. Army Corps of Engineers to assess erosion to beaches within the federal Brevard County Shore Protection Project (BCSPP) area. As a result of that assessment, the Army Corps on March 28 announced approval of the Project Implementation Reports (PIR’s) for the North and South Reaches.

That approval means the Army Corps plans to renourish the North and South Reach beaches using 100 percent federal funds. The most recent benefits cost study by the Army Corps for the BCSPP yields a B:C ration of 5.5:1, meaning for every dollar spent on the project, the county receives $5.50 in economic benefits.

The North Reach, including Cocoa Beach and Cape Canaveral, will receive about 1 million cubic yards of sand with an estimated cost of $16.8 million. Funding for the North Reach will come from both the Flood Control and Coastal Emergencies (FCCE) Hurricane Sandy response fund and normal operation and maintenance funds.

The South Reach, which covers 3.8 miles of shoreline in Indialantic and Melbourne Beach, will be renourished with 585,000 cubic yards of sand. South Reach funding of $12.5 million will come entirely from the FCCE account to restore Hurricane Sandy damage.

The Army Corps has not released an intended construction schedule, but work on both projects is expected to take place between November 2013 and May 1, 2014.

Brevard County is also working to secure state beach restoration funds to repair other county beaches where an Army Corps project has never been constructed, including the Mid Reach and South Beaches areas.

[mappress]

Press Release, April 2, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago