Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›China: Qingdao Terminal Ready for Operation
Business & Finance

April 9, 2013 · about 13 years ago

China: Qingdao Terminal Ready for Operation

On March 31, the cruise terminal project constructed by CCCC First Harbor Engineering Co., Ltd. was delivered for operation after passing the completion acceptance. Located near Terminal 6 of Qingdao’s old port zone, the project involves a 150,000t cruise berth (designed to accommodate 225,000t crui

1 minutes read
  • LinkedIn
  • X
  • Email

On March 31, the cruise terminal project constructed by CCCC First Harbor Engineering Co., Ltd. was delivered for operation after passing the completion acceptance.

Located near Terminal 6 of Qingdao’s old port zone, the project involves a 150,000t cruise berth (designed to accommodate 225,000t cruises in terms of hydraulic structure and length). With a length of 490 meters, a territory depth of 95 meters, a water depth of -13.5 meters and a designed annual through capacity of 600,000 person times, the berth can accommodate the world’s largest 225,000t cruises “Oasis of the Seas” and “Allure of the Seas” all day long.

The buildup of the terminal marks Qingdao has officially owned a berth for large cruises and is of positive significance to promoting Qingdao’s tourist, economic and social development.

[mappress]

Press Release, April 10, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

United States to fund construction of Poti Seaport’s new berth
Berth Expansion

United States to fund construction of Poti Seaport’s new berth

about 1 month ago
The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago