Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›UK: River Nene Dredging Kicks Off
Business & Finance

April 22, 2013 · about 13 years ago

UK: River Nene Dredging Kicks Off

Boaters on a Northamptonshire river will benefit when several thousand tonnes of silt are removed by the Environment Agency to maintain the navigation channel. Between 6,000 and 7,000 tonnes of silt will be removed from a 4km stretch of the River Nene upstream of White Mills Lock. A shoal – or large

2 minutes read
  • LinkedIn
  • X
  • Email

Boaters on a Northamptonshire river will benefit when several thousand tonnes of silt are removed by the Environment Agency to maintain the navigation channel.

Between 6,000 and 7,000 tonnes of silt will be removed from a 4km stretch of the River Nene upstream of White Mills Lock.

A shoal – or large build-up of material – will also be removed from Billing Lock. The work started yesterday and will cost £400,000.

As well as improving navigation, the work will also reduce flood risk by increasing the volume of water that can safely flow through the river.

Environment Agency Project manager David Watts , said: “ Over time, flows cause silt to build up in the river channel. If left, this silt could make boating difficult or hazardous.

“As navigation authority for the River Nene, we have responsibility to maintain the river for boaters and other river-users.

“This will help to make sure people can continue to enjoy the river ready for the start of this year’s spring and summer boating season.”

The silt removal is being carried out by Environment Agency contractors Interserve. The silt will be removed from the river using an excavator on a barge.

Navigation will be restricted along the river while the works take place to ensure the safety of river users.

David added: “ We apologise for any inconvenience this may cause to river traffic. By carrying them out now, we aim to avoid the busiest periods on the boating calendar and keep disruption to a minimum.

“We hope people will understand that we need to carry them out to ensure they can continue to enjoy recreation on the river over the summer and beyond.”

[mappress]

Press Release, April 23, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago