Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Council: Seawall Repairs for Miami (Australia)
Business & Finance

April 29, 2013 · about 13 years ago

Council: Seawall Repairs for Miami (Australia)

A 30-year-old section of the city’s boulder sea wall at Thorn Park, Marine Parade, Miami, is to be replaced over the coming months. Work has started on stage two of a project, north from Santa Monica Road, to protect a section of coastline along Marine Parade. Engineering Services Chair, Councillor

1 minutes read
  • LinkedIn
  • X
  • Email

A 30-year-old section of the city’s boulder sea wall at Thorn Park, Marine Parade, Miami, is to be replaced over the coming months.

Work has started on stage two of a project, north from Santa Monica Road, to protect a section of coastline along Marine Parade.

Engineering Services Chair, Councillor Daphne McDonald said inspections along the old wall showed it was deteriorating at this point.

“The project, estimated to cost $950,000, will replace a section of the seawall approximately 15 metres wide and five metres high, requiring extensive excavation of sand, ” she said.

“The area has been fenced and I remind residents to stay safe around the work site by observing signage and any directions issued by the contractors who will be using heavy equipment.”

The construction is an extension of works completed approximately more than a year ago.

On completion, the boulder wall, which acts as foreshore protection, limiting beach erosion, will be buried under the dune where vegetation is to be reinstated.

Council prioritises funding annually to upgrade and maintain the boulder walls along the foreshore.

[mappress]

Press Release, April 30, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago