Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Bills Bay Marina Dredging Completed (USA)
Business & Finance

May 12, 2013 · about 13 years ago

Bills Bay Marina Dredging Completed (USA)

Bills Bay Marina will now have one of the deepest harbors around the Red Wing area. “We began our dredge project on Monday, April 29th, and completed the removal of 16,600 CY of material on May 10th, 2013,” announced billsbay.com. On April 29th, Portable Barge Services came down to the marina and ma

1 minutes read
  • LinkedIn
  • X
  • Email

Bills Bay Marina will now have one of the deepest harbors around the Red Wing area.

“We began our dredge project on Monday, April 29th, and completed the removal of 16,600 CY of material on May 10th, 2013, ” announced billsbay.com.

On April 29th, Portable Barge Services came down to the marina and marked out the coordinate for the dredge and were ready to begin digging the following Tuesday.

PBS (Portable Barge Services) had some very heavy operating equipment for this project which included a huge backhoe, three barges, and a small work boat. The backhoe sat on one of the three barges and dug down into the water to scoop out the material.

The material was then placed into one of the empty barges and once it was full they would travel upriver to the Red Wing bulkheads and transfer the material to a Caterpillar off-road dump truck which would bring the material down the road load after load to the Red Wing disposal site and dump the material into a large bowl that was built by Fitzgerald Excavating Trucking out of Goodhue, MN.

The removal of the material and dumping into the disposal site continued for 9 days.

More info

[mappress]

Press Release, May 13, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago