Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Meeting Scheduled for Glover’s Point Bend Project (USA)
Business & Finance

May 12, 2013 · about 13 years ago

Meeting Scheduled for Glover’s Point Bend Project (USA)

A public meeting to gather input on the development of the proposed Glover’s Point Bend Shallow Water Habitat Project in Thurston County, Neb., will be hosted by the U.S. Army Corps of Engineers Thursday, May 16 from 5:00 p.m. to 7:00 p.m. The meeting will be held in Sloan, Iowa at the WinnaVegas Ca

1 minutes read
  • LinkedIn
  • X
  • Email

A public meeting to gather input on the development of the proposed Glover’s Point Bend Shallow Water Habitat Project in Thurston County, Neb., will be hosted by the U.S. Army Corps of Engineers Thursday, May 16 from 5:00 p.m. to 7:00 p.m.

The meeting will be held in Sloan, Iowa at the WinnaVegas Casino Resort located at 1500 330th Street. The proposed Glover’s Point Bend Shallow Water Habitat Project is being developed as part of the Corps’ Missouri River Recovery Program.

The Corps will conduct the meeting, which will feature a short presentation detailing the goals and objectives of the proposed project. An open-house session will follow, and the public is invited to view exhibits and visit with Agency staff regarding the proposed project.

The purpose of site-specific Missouri River Recovery Program Projects such as the Glover’s Point Bend Project is to restore habitat for the federally endangered pallid sturgeon and to mitigate the loss of fish and wildlife habitat that occurred due to the construction of the Missouri River Bank Stabilization and Navigation Project. The proposed project area is located on land owned by the Winnebago Tribe of Nebraska between Missouri River miles 714 and 710, along the right descending bank.

[mappress]

Press Release, May 13, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago