Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Canada: Port Hope Dredging Program About to Begin
Business & Finance

May 20, 2013 · about 13 years ago

Canada: Port Hope Dredging Program About to Begin

Dredging of the Port Hope harbour will begin this month as part of the Municipality’s annual maintenance program to allow safe access for boaters during the summer. In the past two years, dredging has been limited to clearing a channel along the west wall for boater access. With the implementation o

1 minutes read
  • LinkedIn
  • X
  • Email

Dredging of the Port Hope harbour will begin this month as part of the Municipality’s annual maintenance program to allow safe access for boaters during the summer.

In the past two years, dredging has been limited to clearing a channel along the west wall for boater access. With the implementation of the Municipality’s Sediment Management and Dredging Strategy in October 2012, 5,000 m3 of sediment will be dredged from the outer harbour to obtain a depth of 3 meters.

Following a tendering process, the Town of Cobourg was awarded the contract and their suction dredger will be mobilized at the site this week in preparation for the work which will commence after the long weekend. An upset limit of 5,000 m3 of sediment will be removed from the defined area and monitored using a GPS system located on the equipment to ensure volumes are tracked carefully.

Initial sediment samples have been analyzed and results submitted to the Ministry of Environment (MOE). Once dredging begins, sediment will be piled on the beach while additional samples undergo testing. Sampling will continue throughout the process and following confirmation that the sediment meets MOE guidelines, it will be distributed as nourishment on the East beach.

Dredging and excavation is expected to take approximately four weeks, subject to weather.

[mappress]

Press Release, May 20, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago