Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USA: Wiggins Pass Beach and Channel Ready for Visitors
Business & Finance

May 21, 2013 · about 13 years ago

USA: Wiggins Pass Beach and Channel Ready for Visitors

All dredging requiring sand placement or interface with Wiggins Pass Beach was completed by May 1 as required by permit to avoid turtle nesting season. A total of 94,000 cubic yards of materials have been placed or removed during the $1,754,000 pass maintenance project conducted by contractor Orion

1 minutes read
  • LinkedIn
  • X
  • Email

All dredging requiring sand placement or interface with Wiggins Pass Beach was completed by May 1 as required by permit to avoid turtle nesting season.

A total of 94,000 cubic yards of materials have been placed or removed during the $1,754,000 pass maintenance project conducted by contractor Orion Marine Construction. Dredging activity included straightening the Wiggins Pass S-shaped channel.

During dredging, an unexpected 2,000 to 4,000 cubic yards of hard-packed material, including rock fragments and consolidated shells, was encountered. Removal of this material is continuing for approximately two more weeks with excavation using a backhoe and barge. The hard material will be disposed of in a former borrow area about two miles off shore.

Despite being peak tourist season, the schedule mandated by permit was for beach work to be conducted during the two months prior to turtle nesting season.

In the past 20 years, Wiggins Pass has been dredged 13 times and needs repeat work more often since it has been refilling with sand with increased frequency. Historically, the pass has been dredged every two years but recent trends have the channel filling in every 18 months to un-navigable conditions. In addition to unsafe boating conditions, Barefoot Beach and the mangrove channel to the north have experienced significant erosion.

[mappress]

Press Release, May 22, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago