Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Terra Et Aqua: Innovative Design, Techniques and Equipment at Maasvlakte 2
Business & Finance

June 3, 2013 · about 13 years ago

Terra Et Aqua: Innovative Design, Techniques and Equipment at Maasvlakte 2

The Port of Rotterdam is currently undergoing a massive extension called Maasvlakte 2. Between 2008 and 2013, 240 million cubic metres of sand have been deposited from which 210 million m3 is dredged from a sand extraction area in the North Sea and around 30 million m3 comes from dredging the port b

2 minutes read
  • LinkedIn
  • X
  • Email

The Port of Rotterdam is currently undergoing a massive extension called Maasvlakte 2.

Between 2008 and 2013, 240 million cubic metres of sand have been deposited from which 210 million m3 is dredged from a sand extraction area in the North Sea and around 30 million m3 comes from dredging the port basins and the Yangtzehaven. During the first phase 700 hectares of new port area will be created.

A combination of hard and soft sea defences in the North Sea will protect the new port from the elements.

Beach and dunes with a length of 7.3 km form the soft part of the sea defence. The 3.5-km-long hard sea defence comprises 7 million tonnes of rock and around 20,000 concrete blocks weighing 40 tonnes a piece.

PUMA (Project Organisatie Uitbreiding Maasvlakte) formed by Netherlands-based dredging companies Van Oord and Boskalis are responsible for the design, construction and maintenance of this immense project.

The economic importance of the port extension is significant. The area added to the port in the 1970s, Maasvlakte 1, has virtually no room left for new companies and existing clients that wish to expand. The Maasvlakte 2 project will contribute to keeping the Port of Rotterdam in its current position as Europe’s most important port.

With the construction of the 20-m-deep harbour basins and access channel it will be ready for the container ships of the future.

More info

[mappress]

Press Release, June 3, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago