Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›UK: Flood Work Improvements Begin on Parrett and Sowy Defences
Business & Finance

June 6, 2013 · about 13 years ago

UK: Flood Work Improvements Begin on Parrett and Sowy Defences

Construction work will begin this week on improvements to the 4.2 kilometres of the flood defences on the River Parrett between Willow Bridge near Stathe and Monks Leaze Clyse, near Combe. The works will involve raising sections of the right bank of the River Parrett between Allermoor Spillway and B

2 minutes read
  • LinkedIn
  • X
  • Email

Construction work will begin this week on improvements to the 4.2 kilometres of the flood defences on the River Parrett between Willow Bridge near Stathe and Monks Leaze Clyse, near Combe.

The works will involve raising sections of the right bank of the River Parrett between Allermoor Spillway and Beazley’s Spillway by up to 200mm in some places. This will provide a consistent profile and help to prevent ‘scouring’ of localised low spots which could otherwise lead to failure of the flood bank.

Works will also be carried out to lower the 550m long Allermoor Spillway by 200mm to re-establish its original design level, and to widen the right bank of the River Parrett in two locations where erosion has occurred.

It will also include improvements to Weir Bridge Rhyne Tilting Weir and the repair of a number of ‘scour’ holes on the back face of the right bank of the River Parrett, along the section on which bank raising will be carried out.

‘ We have also been reassessing the left bank levels on the Wick Moor and Oath side and have recently collected additional survey data at a number of points along the left bank,’ said Andrea Summers for the Environment Agency .

‘If necessary, and where practical, any low spots on the left bank will also be raised or strengthened as a part of this project to ensure that the existing status quo of preferential flow over the right bank spillways is maintained. This will ensure that flood risk to left bank residents is not increased.’

These works are being funded by Local Levy and will avoid costly major maintenance of the banks in future years. Works are planned to start this week and should be completed by the end of the summer, weather permitting.

[mappress]

Press Release, June 6, 2013: Image: thisissomerset

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago