Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›WODCON XX: Solution for Vibration Challenges on Cutter Suction Dredgers
Business & Finance

June 6, 2013 · about 13 years ago

WODCON XX: Solution for Vibration Challenges on Cutter Suction Dredgers

Van Oord’s powerful cutter suction dredger Athena was built by IHC Dredgers for dredging in hard soil. The strong vibrations on this type of dredger are notorious for their negative effects on the working and living conditions on board. Van Oord’s global dredging experience, IHC’s drive to build inn

2 minutes read
  • LinkedIn
  • X
  • Email

Van Oord’s powerful cutter suction dredger Athena was built by IHC Dredgers for dredging in hard soil.

The strong vibrations on this type of dredger are notorious for their negative effects on the working and living conditions on board. Van Oord’s global dredging experience, IHC’s drive to build innovative dredgers and Loggers’ know-how of shock, vibration and noise control were combined in the development of an innovative solution, that puts an end to this problem most major dredging contractors are facing.

A fully automated system continuously monitors and controls air springs providing horizontal and vertical stabilization of the deck house during operation. As traditional vibration mounts only isolate vibrations from 9 Hz, the Athena required an advanced solution isolating also the low frequencies the crew is exposed to.

The completely new solution isolates vibrations starting at 2 Hz that would otherwise be transferred from the cutter head, through the hull to the crew in the accommodations. It also isolates the shocks induced when the cutter head sets its teeth into a newly encountered piece of rock. These capabilities make all the difference between shaky and noisy working conditions and a safe and quiet environment on the Athena.

Important factors need to be taken into account when setting a heavy deck house afloat on air. such as safety precautions, forces inflicted on the deck house caused by ship movements and wind. By sharing their experience in dredging projects and valuable input data. Van Oord and IHC enabled Loggers’ engineers to perform accurate simulations of the system under different circumstances.

In practice, not only the crew benefits from the calm as predicted by the simulation, but their employer as well. With the Athena Van Oord complies with strict local laws and regulations while strengthening the company’s image as an employer of choice.

More info

[mappress]

Dredging Today Staff, June 6, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceEquipmentTechnologyVessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

11 days ago

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

12 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

11 days ago
Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

12 days ago