Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USA: Officials Push for Saginaw River Dredging
Business & Finance

June 9, 2013 · about 13 years ago

USA: Officials Push for Saginaw River Dredging

Sens. Carl Levin and Debbie Stabenow, both D-Mich., and Rep. Dan Kildee, D-MI05, wrote to the U.S. Army Corps of Engineers to advocate for emergency funding for the Saginaw River. Their letter follows: “This spring, heavy rains and flooding in the Saginaw, Michigan, area have resulted in significant

1 minutes read
  • LinkedIn
  • X
  • Email

Sens. Carl Levin and Debbie Stabenow, both D-Mich., and Rep. Dan Kildee, D-MI05, wrote to the U.S. Army Corps of Engineers to advocate for emergency funding for the Saginaw River.

Their letter follows:

“ This spring, heavy rains and flooding in the Saginaw, Michigan, area have resulted in significant sedimentation in the Saginaw River and Bay, severely restricting shipping to vital businesses in the Saginaw area. Goods shipped on the river include coal that powers electric generators, cement and aggregate that is needed to complete the I-75 highway resurfacing project, and limestone, potash, grain and other raw materials to supply businesses along the river.

Specifically, the storms resulted in shoaling of the Saginaw River turning basin, reducing its depth from 20 feet to 12-13 feet. This change in depth means that larger vessels cannot get up to businesses in Saginaw, and smaller vessels have to back up the river, making for dangerous navigation. The Corps has indicated they are looking for $1.2 million to address the emergency dredging requirements of the Saginaw River Turning Basin. We strongly support this emergency funding, and we ask that you act urgently to ensure that emergency funds are allocated to the Saginaw River project.”

[mappress]

Press Release, June 10, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago