Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›WODCON XX: Land Reclamation by Using Mixture of Dredged Soil and Converter Slag
Business & Finance

June 9, 2013 · about 13 years ago

WODCON XX: Land Reclamation by Using Mixture of Dredged Soil and Converter Slag

A lot of dredged material removal has occurred in recent years for maintaining the depth of channels and anchorages. Also, a lack of the land for the disposal of dredged soil has become a problem. At the same time, converter slag that has properties such as wear resistance or hydraulic properties ha

1 minutes read
  • LinkedIn
  • X
  • Email

A lot of dredged material removal has occurred in recent years for maintaining the depth of channels and anchorages.

Also, a lack of the land for the disposal of dredged soil has become a problem.

At the same time, converter slag that has properties such as wear resistance or hydraulic properties has been used as a civil works material in areas such as roadbeds. However, with the reduction of public construction recently, development of new usages is expected.

Therefore, we have developed in coastal areas the utilization of at mixture of dredged soil and converter slag (usually called “slag stabilized soil”). From previous studies, characteristics such as hardening and a suppressed increase in pH is known.

It is used as a material for the “padding” of tidal flats and marine forests, and for backfilling hollows where a large quantity of sand from the sea bottom has been placed for urban development.

Based on an experiment using a pneumatic flow mixing method where slag stabilized soil was used as a material for reclamation, large-scale rapid reclamation work was performed with the aim of satisfying an average strength of 50kN/ nr (long-term curing).

At the same time it was confirmed that there was 110 adverse influence 011 the water quality in the peripheral sea area during the reclamation period.

More info

Dredging Today Staff, June 10, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago