Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Philippines: DRR/CCA Plan Includes Dredging
Business & Finance

June 10, 2013 · about 13 years ago

Philippines: DRR/CCA Plan Includes Dredging

Macabebe Elementary School welcomed its more than a thousand enrolees Monday despite its unfinished classrooms following construction delays due to intermittent rains last summer which created “fishponds” within its premises. Principal Marlene Manansala shared that “through the support of the provin

2 minutes read
  • LinkedIn
  • X
  • Email

Macabebe Elementary School welcomed its more than a thousand enrolees Monday despite its unfinished classrooms following construction delays due to intermittent rains last summer which created “fishponds” within its premises.

Principal Marlene Manansala shared that “through the support of the provincial government, 33 dump trucks were provided to cover the fishponds with sands, and this, about half a meter was dealt. But we still need more of this, a hundred trucks will suffice.”

Macabebe Elementary School has a total of seven functional and two non-functional school buildings. With the floodings over the past years, 20 classrooms are needed to be elevated.

“ We have enough teachers but what we demand is these situations needed to be addressed for this is for our school children, ” Manansala added.

This problem shall soon be addressed after the school was selected as among the 47-flood affected schools in the province of Pampanga that is bound to benefit from the P4.6 billion “Integrated Disaster Risk Reduction (DRR) and Climate Change Adaptation (CCA) Measures in Low-Lying Areas of Pampanga Bay.”

DRR/CCA has two major components – first is the dredging of more than 32-kilometer rivers of the province to prevent them from overflowing during rainy seasons while the second part is the elevation of flood prone areas and the transfer of schools to safer grounds to protect the structures from ravages of floodwaters.

It aims to reduce the flood level from 1.42 to 2.99 meters and the number of flood-affected areas from 40,150 hectares to 23,780 hectares in the low-lying areas of Pampanga Bay.

[mappress]

Press Release, June 10, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago