Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USA: Sandbridge Beach Renourishment Moves Ahead
Business & Finance

June 12, 2013 · about 13 years ago

USA: Sandbridge Beach Renourishment Moves Ahead

The Sandbridge hurricane protection and beach renourishment project is moving forward. The hopper dredge BE Lindholm, anchored off the coast of Virginia Beach, is pumping sand from the ocean’s floor. The sand is transferred through a piping system into a strainer before it is placed on the beach. Do

1 minutes read
  • LinkedIn
  • X
  • Email

The Sandbridge hurricane protection and beach renourishment project is moving forward.

The hopper dredge BE Lindholm, anchored off the coast of Virginia Beach, is pumping sand from the ocean’s floor.

The sand is transferred through a piping system into a strainer before it is placed on the beach. Dozers then move the sand to expand and build up the beach front.

This $13.35 million non-federal project included the dredging and placement of approximately 2 million cubic yards of sand along public beachfront from Back Bay National Wildlife Refuge to the Dam Neck Naval facility.

[mappress]

Dredging Today Staff, June 13, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago