Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Elia Seeks Contractor for Belgian Artificial Island (UK)
Business & Finance

June 21, 2013 · about 13 years ago

Elia Seeks Contractor for Belgian Artificial Island (UK)

Elia Asset NV is looking for contractor to conduct study, construction and maintenance of an artificial island, Alpha, which is to be located approx. 45kms offshore from the port of Zeebrugge on the Lodewijk bank and characterised by a depth of approx. 30m LAT. The entire island must be designed, bu

2 minutes read
  • LinkedIn
  • X
  • Email

Elia Asset NV is looking for contractor to conduct study, construction and maintenance of an artificial island, Alpha, which is to be located approx. 45kms offshore from the port of Zeebrugge on the Lodewijk bank and characterised by a depth of approx. 30m LAT.

The entire island must be designed, built and maintained so that the construction, installation, maintenance and access to OHVS Alpha comply with the requirements imposed on the principal.

The functional requirements for the island are currently defined as follows:

– Equipped with all infrastructure and installations for the construction, foundation and maintenance of and access to the OHVS (approx. 60m x 40m, 9m high) and all its components, and for the construction, foundation and maintenance of all cable connections, including construction of a cable basement (est. height: 4.5m);

– Helicopter landing pad;

– Protected embankment.

In its design, installation and maintenance, the tenderer must also take account of the fact that the construction of the island must be modular so that any additional functionality is easy to implement without any loss of existing functionality and with minimal effort.

Looking to the future, the need to, for instance, expand the island by building an HVDC converter station can result in a larger useful surface area for the island.

In addition, during design, construction and maintenance, account must be taken and appropriate adjustments made in line with the fact that the OHVS on Alpha will be connected using various high farms and export cables to the coast and to the OHVS at position Beta.

[mappress]

Dredging Today Staff, June 21, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago