Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Hudson Dredging: Plan for Remedial Action Work Introduced (USA)
Business & Finance

June 27, 2013 · about 13 years ago

Hudson Dredging: Plan for Remedial Action Work Introduced (USA)

The General Electric Company (GE) has announced the 2013 Remedial Action Work Plan for the Hudson River dredging program. This Remedial Action Work Plan for Phase 2 for dredging and facility operations in 2013 (2013 RAWP) constitutes GE’s RAWP for the dredging to be performed in the third year of Ph

1 minutes read
  • LinkedIn
  • X
  • Email

The General Electric Company (GE) has announced the 2013 Remedial Action Work Plan for the Hudson River dredging program.

This Remedial Action Work Plan for Phase 2 for dredging and facility operations in 2013 (2013 RAWP) constitutes GE’s RAWP for the dredging to be performed in the third year of Phase 2.

In addition, GE has submitted to EPA a Phase 2 Final Design Report for 2013, which provides GE’s design plans for the third year of Phase 2.

PROJECT SETTING

The Upper Hudson River is defined as the section of river from Fenimore Bridge in Hudson Falls to the Federal Dam at Troy, New York. The ROD calls for, among other things, a remedial action to remove and dispose of sediments containing PCBs from the Upper Hudson River.

Sediments to be removed are defined based on the PCB mass per unit area (MPA) and surface concentration criteria.

The ROD defined three sections of the Upper Hudson River for the sediment remediation activities:

• River Section 1: Former location of Fort Edward Dam to Thompson Island Dam (TID) (from river mile [RM] 194.8 to RM 188.5; approximately 6.3 river miles);

• River Section 2: TID to Northumberland Dam (from RM 188.5 to RM 183.4; approximately 5.1 RM); and

• River Section 3: Northumberland Dam to the Federal Dam at Troy (from RM 183.4 to RM 153.9; approximately 29.5 river miles).

More info

[mappress]

Press Release, June 28, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago