Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›News›Cameroon: Kribi Deepwater Port Project Reaches Milestone
News

June 28, 2013 · about 13 years ago

Cameroon: Kribi Deepwater Port Project Reaches Milestone

From May 31 to June 1, in the Cameroon Kribi Deepwater Port Project, the installation of the first caisson and the first underwater reef blasting at the wharf foundation trench was completed one after another, marking the important progress in the project. At 19 o’clock on May 31, with the close coo

1 minutes read
  • LinkedIn
  • X
  • Email

From May 31 to June 1, in the Cameroon Kribi Deepwater Port Project, the installation of the first caisson and the first underwater reef blasting at the wharf foundation trench was completed one after another, marking the important progress in the project.

At 19 o’clock on May 31, with the close cooperation and careful cooperation of the operators and ship dispatch, the first caisson of Kribi Deepwater Port Project safely arrived at the designated installation location and the installation was smoothly completed. In this project, there are 33 caissons, about 2500 tons each. Here, the erecting formwork pouring technology is adopted; they are transported by airbags and installed through semi-submersible barge.

At half past 17 on June 1, the project operators, in strict accordance with the relevant laws and regulations, safety regulations and blasting process, conducted the first underwater reef blasting at the wharf foundation trench, providing a solid guarantee for the smooth installation of the follow-up caissons.

Caisson installation and underwater reef blasting are two processes with the largest port construction difficulty and the highest technical content which are the most crucial to the safety production. The successful completion of the above work shows the relatively high engineering management capabilities of CHEC and the Company was highly praised by the client.

[mappress]

Press Release, June 28, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

News

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Damen reports strong financial performance in 2024
News

Damen reports strong financial performance in 2024

about 9 months ago
Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included
News

Port of Tanjung Pelepas builds Berth Zero, dredging and land reclamation included

about 9 months ago