Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Venezuela: Puerto Cabello Terminal Scheme Passes Review
Business & Finance

June 28, 2013 · about 13 years ago

Venezuela: Puerto Cabello Terminal Scheme Passes Review

The foundation design scheme for New Container Terminal in Puerto Cabello, Venezuela, smoothly passed the review, showing the scientific and rigorous design management level of CHEC, which strongly promoted the implementation of the project. On May 6, the client formally approved the two major desig

1 minutes read
  • LinkedIn
  • X
  • Email

The foundation design scheme for New Container Terminal in Puerto Cabello, Venezuela, smoothly passed the review, showing the scientific and rigorous design management level of CHEC, which strongly promoted the implementation of the project.

On May 6, the client formally approved the two major design changes of “ selecting large cylinder structural style for breakwater ” and “ layout plan for port land area after the red line is adjusted ” put forward by the project department. Then, the project management submitted the basic design documents, proceeded actively with technical communication and exchange and made preparation for the review of basic design.

On May 20, the review meeting about the basic design for this project was formally held, which originally would take four days but successfully completed in two days. The basic design provided by CHEC smoothly passed the review by the client and the engineer and was highly praised.

In addition, at the meeting, it was also decided that the client representative would make a project investigation in China recently to further learn the technical strength and construction capabilities of the Company and promote the examination and approval about the final pricing and implementation scheme for Cabello project.

[mappress]

Press Release, June 28, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago