Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Signet Maritime: Application for Coastal Wetlands Permit (USA)
Business & Finance

August 25, 2013 · about 13 years ago

Signet Maritime: Application for Coastal Wetlands Permit (USA)

Signet Maritime Corporation has filed an application for a Permit with the Department of Marine Resources requesting permission to conduct regulated activities under the provision of the Coastal Wetlands Protection Law Act. The applicant is proposing to maintenance dredge a portion of the Pascagoula

2 minutes read
  • LinkedIn
  • X
  • Email

Signet Maritime Corporation has filed an application for a Permit with the Department of Marine Resources requesting permission to conduct regulated activities under the provision of the Coastal Wetlands Protection Law Act.

The applicant is proposing to maintenance dredge a portion of the Pascagoula River and an existing boat slip near 3802 Port River Road in Pascagoula, Jackson County. The proposed channel dredging is 580 feet in length and an average of 60 feet in width from a current depth of 8 feet below Mean Low Water to a final depth of 20 feet below Mean Low Water.

The proposed boat slip dredging is 120 feet in length and 100 feet in width from a current depth ranging from 1.5 feet to 17 feet below Mean Low Water to a final depth of 20 feet below Mean Low Water. A total of 43,435 cubic yards of material is proposed for removal. The applicant has proposed that the dredged material be taken to a Mississippi Beneficial Use Site. The applicant is also proposing to replace 950 feet of bulkhead and construct 150 feet of new bulkhead. Approximately 0.051 acre of non-vegetated state owned waterbottoms will be filled landward of the new and proposed bulkheads.

As mitigation for these impacts, the applicant has proposed widening an existing on-site keyhole boat slip by excavating 12 feet of uplands to create 0.082 acre of new waterbottoms which will be deeded to the State. The applicant has requested two variances to the Guidelines for Regulated Activities in the Mississippi Coastal Program and plans to justify those variances in accordance with Chapter 8, Section 2, Part I.E.2.c.iv.

The first variance is from Chapter 8, Section 2, Part III.D.3, which reads: “ Vertical face structures shall be aligned no further waterward than mean high tide, and constructed so that reflective wave energy does not destroy adjacent wetlands habitat.”

The second variance is from Chapter 8, Section 2, Part III.O.1, which reads: “ Permanent filling of coastal wetlands because of potential adverse and cumulative environmental impacts is discouraged.”

A public hearing for the proposed project will be held at 6:00 p.m. on Monday, September 9, 2013, at the Bolton State Building located at 1141 Bayview Avenue in Biloxi, MS. The public hearing will not be a question and answer session, but will be a medium for concerned parties to make comments about the proposed project for the public record.

[mappress]

Press Release, August 26, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago