Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Manson Construction Wins Galveston Dredging Deal (USA)
Business & Finance

August 31, 2013 · about 13 years ago

Manson Construction Wins Galveston Dredging Deal (USA)

The U.S. Army Corps of Engineers Galveston District awarded a contract in the amount of $13,287,950 to Seattle, Wash.-based Manson Construction Company to perform maintenance dredging within the Galveston inner and outer bar, entrance channel and a portion of the Houston Ship Channel. The contractor

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers Galveston District awarded a contract in the amount of $13,287,950 to Seattle, Wash.-based Manson Construction Company to perform maintenance dredging within the Galveston inner and outer bar, entrance channel and a portion of the Houston Ship Channel.

The contractor is required to remove approximately 3,000,000 cubic yards of shoaled material from these channel reaches.

“This periodic maintenance dredging provides sufficient channel depth for the transit of deep draft vessels which call on the facilities at the Port of Houston, Texas City and Galveston as well as various industries along the channel ,” said Tricia Campbell, an operations manager with the USACE Galveston District . “All dredge material from this contract will be placed in an offshore dredged material disposal site.”

According to Campbell, the ports of Houston, Texas City and Galveston rank 2nd, 11th and 41st (respectively) based on total tonnage transited through each port.

Work is scheduled to begin in September 2013 with an estimated completion date of December 2013.

The USACE Galveston District was established in 1880 as the first engineer district in Texas to oversee river and harbor improvements. The district is directly responsible for maintaining more than 1,000 miles of channel, including 250 miles of deep draft and 750 miles of shallow draft as well as the Colorado River Locks and Brazos River Floodgates.

[mappress]

Press Release, September 1, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago