Dredging Today
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USA: Des Plaines River Report Released for Public Comment
Business & Finance

September 3, 2013 · about 13 years ago

USA: Des Plaines River Report Released for Public Comment

The U.S. Army Corps of Engineers (USACE), Chicago District released for public comment the “Upper Des Plaines River and Tributaries, Illinois and Wisconsin Integrated Feasibility Report and Environmental Assessment,” Sept. 3, 2013. The document outlines a variety of potential flood risk management a

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers (USACE), Chicago District released for public comment the “Upper Des Plaines River and Tributaries, Illinois and Wisconsin Integrated Feasibility Report and Environmental Assessment,” Sept. 3, 2013.

The document outlines a variety of potential flood risk management and ecosystem restoration projects that could be implemented along the Upper Des Plaines River – an area that extends approximately from Racine, Wis., to Riverside, Ill.

Comments will be accepted by the Chicago District until Oct. 2, 2013. In addition, digital copies of the integrated report will be available at the following libraries within the project study area: Des Plaines; Franklin Park; Warren Newport in Gurnee; Cook Memorial in Libertyville; Vernon Area in Lincolnshire; Park Ridge; Prospect Heights; River Grove; Riverside; Schiller Park; and Indian Trails in Wheeling.

The study was completed in partnership with the Illinois Department of Natural Resources (Office of Water Resources), Lake County Stormwater Management Commission, Cook County, Metropolitan Water Reclamation District of Greater Chicago and Kenosha County.

“This report is unique in that it gives us the opportunity to look at the entire watershed from a holistic approach – allowing us to consider a variety of issues impacting the river and its tributaries, ” said Col. Frederic A. Drummond Jr, commander, Chicago District.

The plans outlined in the draft report propose the construction of levees, reservoirs and other features to reduce flood damages in the Upper Des Plaines River watershed. If approved, the projects will reduce flood risk in communities across the watershed, providing approximately $6.8 million annual net economic benefits. The plans also include proposed ecosystem restoration features that would restore over 10,900 acres of native marsh, meadow, prairie, savanna, woodland and forest habitats in the watershed. Other features including recreational trails are also a part of the proposed plans.

“The state appreciates the work that USACE has put into looking at problems on the Des Plaines River, and we look forward to opportunities to help solve some of the flooding and ecological issues of the watershed, ” said Arlan Juhl, director, Office of Water Resources, Illinois Department of Natural Resources.

This study builds upon the previously authorized Des Plaines River Phase I Study by including an expanded study area – the entire Upper Des Plaines watershed, including 15 tributaries in Illinois and Wisconsin and an expanded scope – ecosystem restoration, water quality and recreation features.

[mappress]

Press Release, September 4, 2013

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EXCLUSIVE: IHC Equipment extends operational life of TSHD Biesbosch
  2. 2Dredging underway at Beach Haven West Complex
  3. 3Isle of Palms dredging update: Marinex makes steady progress
  4. 4GLDD’s dredger Liberty Island kicks off Buxton beach nourishment

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago